DIY Badge

 


  • Clause 1: I found out where to turn off the water, gas and electricity (knew already to be fair!)
  • Clause 2: I have to change all the lightbulbs in this house.
  • Clause 3: Change a tap washer. Well, none of my washers needed changing so I watched a YouTube video for future reference. 
  • Clause 4: The plug on the tumble drier needed changing, and my daughter wanted practice so I supervised her doing it and double checked it afterwards. I have changed quite a number of plugs over the years.
  • Clause 5: Tumble drier kept tripping the fuse box, which is why we changed the plug, so I had to keep flipping the switch.
  • Clause 6: I have a large toolkit, and know what everything is for. It contains hammers, screwdrivers, spanners, wire strippers, allan keys, paintbrushes, sandpaper, screws, nails.....
  • Clause 7: complete 2 projects:
    • Decorate a wall: bathroom wall prepared and painted, and stairwell, and study, and main bedroom over the last three years.
    • Upcycle: Front door was prepared and repainted rather than be replaced, as I didn't have any furniture needs.





Comments

Popular posts from this blog

Maverick Award

Ultimate Rebel

Summer Silliness